70-71 Princes Square, London

Princes Square is a lovely residence located in the City of Westminster in London.

Minerva Building Restoration Ltd were instructed to carry out internal redecoration work to the communal areas.

Scope of Works

  1. Carry out asbestos survey, remove asbestos floor tiles and clear to registered waste facility.
  2. Remove fixtures and fittings in preparation for internal decoration works.
  3. Remove existing wall lights and terminate electrical supply within the wall.
  4. Remove redundant cabling and re-route.
  5. Allow for NICEIC qualified electrician to investigate and test system.
  6. Remove 4 No’ door linings, frames, architraves.
  7. Replace missing door stops and replace on completion of works.
  8. Trim cupboard doors at ground level.
  9. Supply and fit missing balustrading spindles and skirtings and make good.
  10. Supply and install opaque surface applied manifestation to display the building number.
  11. Remove existing ceiling in entrance foyer, supply and fit British Gypsum Gyproc 15mm fire line board ready for redecoration.
  12. Plaster works to door linings and areas of blown plaster.
  13. Strip existing wallpaper coverings, cut out and repair any cracks to plaster.
  14. Supply and hang new heavy duty lining paper and leave ready for decoration.
  15. Decorate walls with a minimum of two coats Dulux eggshell in colour Timeless.
  16. Make good and decorate ceilings, covings and previously painted stair soffits, handrails, stair strings, balustrading skirtings, treads, risers, architraves, doors and frames.
  17. Decorate post boxes, meters, cabinetry and entrance doors.
  18. Remove existing mat wells to each main entrances and replace with new heavy duty coir matting.
  19. Remove and dispose of existing carpet to landings, hallways, lobbies and stairs and supply and fit new.
  20. Supply and install new surface mounted overhead door closers.
  21. Test and make good any faults on the intercom system.
  22. A full time site manager was supplied for the full duration of the project. This was to liase with all tenants, contractors and RBKC.
  23. All works were completed to programme and budget.

 

Contract Value £91K