Clerkenwell Green is a Grade II listed building that Minerva were instructed to undertake refurbishment works on.
The works included re-roofing which included traditional slate and leadwork and a glazed roof to the rear, external repair and re-decorations.
We worked closely with the client and council to ensure all works were carried out in the correct and best method always taking into account the grade II listing.
Scope of Works:
Minerva Building Restoration Limited were instructed to undertake full external refurbishment project including the strip and re-roof of the main roof area.
The scaffold was erected out of hours to comply with Camden Council licencing requirements:
- Erect/dismantle designed scaffold and beams to all elevations.
- Erect/dismantle designed full temporary roof.
- Strip and re-roof all roof slopes including replacement of lead parapet and valley gutters.
- Produce costed and detailed timber/masonry repair schedules for client approval.
- Undertake timber repairs using the windowcare resin system.
- Carry out a full internal and external decorative programme to all sash windows downpipes and masonry in accordance with the Dulux/Akzo noble specification.
- Supply and install new kee klamp system to the roof perimeter.
Minerva Building Restoration Limited provided a full site management team throughout the project to ensure contract programme were achieved and constant tenant liaison maintained.
Contract Value: £170,000